Structural Steel Going Up
About
The PCEC team is continuing to check items off our to-do list. Currently we’re working on putting up the structural steel in areas A and B. The project is now literally taking shape.
We’ve already completed paving in our parking bays and loop road and installed our sanitary systems. Currently the project is roughly 50% complete.
Upcoming Activities
Composite Deck Pours (Levels 2 and 3) – Planned for Late April / Early May (we’ll send out a notification)
Exterior Metal Framing/Sheathing (Levels 1 – 3)
Roofing Installation
MEP In-Wall/Overhead Rough-Ins
Interior Metal Framing